‘LOWERING THE TONE’, Or, If at first………..

Anyone who has rung at Bulkington will tell you that the tower rocks: not dangerously but enough to affect the ‘go’ of the bells – the treble, 4th and tenor being particularly prone to ‘dropping out’ whilst you are ringing.

In the Tower AGM Minutes for 1992 it was recorded that “Mr Pluckrose (RM) stated that the bells were getting more difficult to ring and it was a credit to the band that the ringing was still of a high standard.” The question of Bell Restoration was raised again in 1995 when funds were being sought for a whole- Church re-ordering, but bells did not feature in the final plans. A proposal was made to the PCC that the bells should be the next priority.

In 1995 Mr Pluckrose obtained two quotes for refurbishing the bells. One quote was for re-building the frame and lowering the weight: £22781 + VAT = £26767.68

The second estimate was to re-model the peal, to site bells lower in the tower and reduce the tenor weight to 9cwt 3qr 4lb : £30,169 +VAT = £35,448.58

An outing was arranged that year to visit peals of 8 with the key of A, the new key Bulkington bells would be tuned to.

But it was not until 1997 that the new Vicar and PCC agreed to a meeting with Bellhangers and Harry Windsor (CDG) to make a full report on the bells, make recommendations and finally give a cost.

In 1999 it was agreed that the second proposal should go ahead if funds could be secured but both Taylors Bell Foundry, and Nicholson Engineering recommended that first a Structural examination of the tower should be carried out and Adrian Dempster was invited to do this and submit a report.

In April 1999 George Pluckrose died prematurely after a short illness and a Bell Restoration Fund was established to continue the work he had started.

Over the next few years various attempts were made to secure funding but the conversion of the Old Village School into a Village Centre thwarted access to many of the Charitable Groups. The installation of a Telephone Transmitter on the top of the tower further prevented any progress being made.

Fast forward now to late 2019! The transmitter (never connected incidentally) was to be taken out and the CDG had inherited a large Legacy in Trust and were probably in a better position to help with funding. So, like the Phoenix, the bell restoration rose from the ashes!

The Ringers agreed that an up-to-date report be obtained from Adrian Dempster, and a paper reiterating the plans to lower the bells was sent to The Vicar for distribution to the PCC for their meeting in February 2020 – the first step to ask Adrian Dempster for a new report. The Vicar stated that he would wait until after the APCM in April and the instalment of a new PCC before he raised the plans for the bells.

THEN – Covid struck! No Ringing. No APCM. No new PCC. No movement on plans!

However, the ringers were not disillusioned but spent much of Lockdown researching grant-making bodies and busying themselves with fund-raising ideas.

THEN – Total Lockdown was lifted, the delayed APCM took place via Zoom, a ‘new’ PCC (looking very much like the old PCC!) was established and Geoff Pratt (RM) and Gerald Trevor (Project Manager) were invited to give a presentation to the PCC Meeting. No opportunity was given for questions to be asked before they were summarily dismissed from the Meeting.

THE PCC REJECTED THE SCHEME UNANIMOUSLY!

Frustrated and hurt, a polite but robust reply was sent to the PCC and should have been raised under ‘Matters Arising’ at the next PCC Meeting in January 2021. It was not – the excuse given was that the Vicar was not at the meeting as he was on paternity leave!

But the Phoenix refused to lie down! When we were permitted to meet in groups after the second/third Lockdown the Ringers held their AGM, in 2021, sitting on chairs outside the Church, socially distancing with the Vicar in the Chair. He took a bit of a bashing over the PCC decision, admitted that Communication had been poor on the PCC’s part and that the PCC did not really understand what had been proposed, but had not asked questions to clarify the plans. It was easier to bury their heads in the sand and hope the ringers would go away!

He did, however, agree to a small Committee ( 3x PCC Members, 3 X Ringers) be established to re-visit the whole project. The first meeting seemed very positive, but we still could not ring due to the restrictions placed on Bell Towers by the Church of England.

THEN – the PCC Finance sub-committee, when renewing the Insurance Policy, decided to tell the Insurers about the rocking tower.

THE INSURERS CLOSED DOWN THE TOWER UNTIL ITS SAFETY WAS ESTABLISHED.

This move caused mayhem , with villagers asking whether the whole Church should be closed, whether it was safe to be in the Churchyard, what would happen if the whole tower fell down and which way was it likely to fall!! It never occurred to them that all towers move to a certain degree.

SO – the Church Architect was summoned! He made a cursory inspection and said he thought it was okay.

THEN – A structural engineer was summoned to examine the effect of the ringing on the tower. He knew nothing about bells and bell ringing, His assessment was that, when sitting on the seat in the belfry, he could feel movement, but it was not anything to worry about. We could all have told him that – at nothing like the cost he charged!

So just before Christmas 2021 permission was given for ringing to begin again at Bulkington.

The small Committee meetings we were now having were beginning to pay dividends and after a second presentation by Gerald Trevor to the PCC in February 2022 it was agreed that the Ringers (at their own expense) could ask for Adrian Dempster to return and up-date his report, after which a Faculty application could be made. A mere two years after our original request to the Vicar and 30 years since the first notion of change was highlighted.

As I write, the DAC has approved the scheme, the Citation for public comment has been posted and by January 14th we should at last have lift-off and will then be in a position to apply for grants. The bell metal for the two new bells has been purchased and we are about to start the ‘begging letters’ to our ‘Golden Supporters’ and then to the various grant-making bodies.

I look forward to being able to write the next instalment – sooner rather than later – about the completion of this long-awaited project.

Joy Pluckrose